Seq2Seq-Based-Day-Ahead Scheduling for SCUC in Islanded Power Systems with Limited Intermittent Generation. (2024). Journal of Engineering, Science and Technological Trends, 1(1). https://doi.org/10.48112/jestt.v1i1c.5